ATS and rod tie-downs, hold-downs, straps, embeds, blocking and backing, modeled and laid out so they land where the framing, concrete and inspectors expect them.

A misplaced embed or hold-down is expensive to fix once concrete is poured. Coordinating these components in 3D before the pour catches conflicts with openings, plumbing and framing early.
We coordinate the system specified for your project, working from the manufacturer's layout and the structural drawings.
No. We model and coordinate what the engineer of record and manufacturer specify. Design questions go back to them as RFIs.
Before the first pour that carries embeds. Starting early gives time to resolve conflicts on paper.
Send drawings and a short description of the scope, and we'll reply with a fixed-fee proposal within 48 hours. Prefer to talk it through first? Book a 15-minute call.